• Blockworks have now commenced on site, with some basement walls now at height.
• Approximately half of the pad footings and strip footings have now been poured
• Approximately 40% of columns have been poured.
• External brickworks have now commenced on site
• Installation of door frames, window frames and garage frames have been accelerated on site.
• Roof plumbing and sheeting will commence on site from next month.