• Blockworks have now commenced on site, with some basement walls now at height.

• Approximately half of the pad footings and strip footings have now been poured

• Approximately 40% of columns have been poured.

                                                       
Find out the latest updates from the Development team below.

• External brickworks have now commenced on site

• Installation of door frames, window frames and garage frames have been accelerated on site.

• Roof plumbing and sheeting will commence on site from next month.